Gigajoule logo

Gigajoule (GIGJ)

Status
STO

Gigajoule Floating Solutions is an electricity generation company. It creates fully operational, gas-based power plants, floating on barges. It uses proven technologies together with Internet of Things (IoT) and blockchain technologies to ensure the highest standards of quality and efficiency. This takes a fraction of the time required for traditional land-based plants, yet rivals or surpasses them in efficiency, reliability and cost.

Gigajoule White Paper WhitepaperGigajoule Onepager Onepager

Important By investing in this business you agree to ourDisclaimer. All information including our rating, is provided merely for informational purposes. CryptoTotem does not provide investment advice.

Interest lvl
NA
Learn more about our rating
User Rating
Medium
3/5 1 votes
Claim your project
Ticker
GIGJ
Type
Security
Token standard
ERC1400
FoundedMalta
Registration countryMalta
Registration year2016

What is Gigajoule

Gigajoule is an electricity energy solution that is premised on the Floating Power Plant. By combining state-of-the-art technologies from other mature industries, we make possible the supply of electrical energy to millions of people currently without access to power.

Gigajoule is going to deploy a natural gas powered solution known as a “Floating Power Plant”, based on a technology developed by Siemens.

What problem do we solve?

Today, it is estimated that up to 2 billion people worldwide do not have access to electrical power, a figure that is increasing year after year. This problem is more acute in countries like Nigeria, where only 45% of the population has electricity, and those who have it do so at a high economic and environmental cost, mainly due to the widespread use of diesel and petrol for operating small generators.

How do we solve it?

Gigajoule will deploy their Floating Power Plants (FPP) in 3 different Nigerian locations close to existing gas supply and transmission infrastructure in Delta, Anambra & Cross River States.

Each of the 3 projects will supply electricity to the Nigerian Government for a renewable term of 20 years, within the framework of the Nigeria Electricity Regulatory Commission.

A Partial Risk Guarantee, provided by MIGA of the World Bank, ensures the obligations of the Federal Government to pay for installed and utilized capacity throughout the lifespan of the Power Purchase Agreement (PPA).

Finally, production capacity is underwritten by Siemens for the life of the project.

Gigajoule Roadmap

1
Sep 2019
  • Incorporation and setup of Malta-based holding company
  • IEO private Pre-sale
  • 2
    Jan 2020
  • IEO Public Sale - Jan 2020.
  • 3
    Mar 2020
  • Engagement with Siemens and Appledore Shipyard for the final design and construction commencement of first 2 floating power plants.
  • 4
    Sep 2020
  • Secure funding underwritten by the Multilateral Investment Guarantee Agency (MIGA) and Siemens performance warranty.
  • 5
    Nov 2020
  • Finalize Power Purchase Agreement with Federal Government of Nigeria plus all other construction and operating agreements for the implementation of the first project.
  • 6
    Mar 2021
  • Lenders ready to advance first funds for project constructions.
  • 7
    Apr 2021
  • Implement the construction disbursement, administration and control procedures.
  • 8
    Jul 2021
  • Appledore shipyard and Siemens start the manufacture and construction of the floating power plants within 15 months.
  • 9
    Aug 2022
  • Floating power platforms to be loaded onto heavy lift ships and, within a month, shipped to the closest deep-water position offshore the lagoon or river from which the move to final installation will take place in Nigeria.
  • 10
    Nov 2022
  • Commissioning and handover.
  • 11
    Jan 2023
  • Electrical power supply commences and continues for the next 20 years, under Power Purchase Agreement with the government of Nigeria.
  • 12
    Dec 2042
  • Power Purchase Agreement finalizes. Potential extension of the Agreement for another twenty year term with the same assets, would be negotiated with Nigerian Government.
  • Token Sale Dates

    Presale Period

    Start date: Nov 01, 2019
    End date: Dec 31, 2019

    ICO

    Start date: Jan 01, 2020
    End date: Apr 30, 2020

    Token Allocation

    Total Token Supply 20,000,000 GIGJ
    Total Tokens for Sale 16,000,000 GIGJ

    Funding Details

    Soft Cap 6,000,000 USD
    Hard Cap 14,400,000 USD

    Token distribution


    STO token sale - 80%
    Gigajoule team - 10%
    Advisors & partners - 10%

    Token Price and Payment Options

    Token price USD 1 GIGJ = 0.7 USD
    Accepted Currencies USD, BTC, ETH, DAI

    Project team

    GARDNER, DAVID
    GARDNER, DAVID
    Founder & Senior Engineer
    GARDNER, DAVID linkedin-team
    POTTER, CHRIS
    POTTER, CHRIS
    Founder & Maritime Engineer
    POTTER, CHRIS linkedin-team
    SCHWARTZ, RUSSEL
    SCHWARTZ, RUSSEL
    Founder & Chief Executive Officer
    SCHWARTZ, RUSSEL linkedin-team
    SCHWARTZ, WARREN
    SCHWARTZ, WARREN
    Founder & Software Engineer
    SCHWARTZ, WARREN linkedin-team

    Advisors

    Tarlan Kornilov
    Tarlan Kornilov
    Managing Director at Elite Consulting
    Tarlan Kornilov linkedin-team
    Sergey Baloyan
    Sergey Baloyan
    CMO/CBDO. Founder of X10.Agency. STO/ICO/IEO consultant. Worked with 30+ ICO/STO projects. Medium Top
    Sergey Baloyan linkedin-team

    Social media

    Industries

    Leave a Reply

    Your email address will not be published. Required fields are marked *

    listing on exchanges

    Leave a Reply

    Your email address will not be published. Required fields are marked *

    Sponsored Crypto Projects

    KYMAi (KYMAI) logo
    KYMAi (KYMAI) Sponsored
    KYMAi (KYMAI)
    Low
    ICO
    NOCtura (NOC) logo
    NOCtura (NOC) Sponsored
    NOCtura (NOC)
    Low
    ICO
    Zama (ZAMA) logo
    Zama (ZAMA)
    High
    ICO
    IEO

    Newly Published