Zavod CoinICO Modernization of available and creation of new production in two lines consisting of several stages and development vectors is carried out in the territory of production facilities of LLC “ChPRP” In the city of Cherepovets, Vologda Region. IMPORTANT: By investing in this business you agree to ourDisclaimer. All information including our rating, is provided merely for informational purposes. CryptoTotem does not provide investment advice. |
Overview
|
Technical details
Manufacture of large diameter pipes, shaped electric-welded pipes, electric-welded pipes according to GOST 10704 91.
What is Zavod Coin
Modernization of existing production facilities and creation of new ones including: - manufacture of electric welded pipes within the scope of TESA 25-57 tube mill reconstruction. - purchase and commissioning of high-efficiency TESA 10-60 tube mill. - modernization of production site manufacturing large-diameter pipes (LDP) by creation of preparation park and increase of the park of processing (bending and forming) equipment of high efficiency, which will enable to expand the range of produced goods and to increase the volume and enhance the quality of products to be made on their basis. - arrangement of production of elliptic, spherical dish-shaped and conic bottoms and fittings.
Token infoAccepted currencies: BTC, ETH, Euro, DollarsToken distribution: Investors: 82 % of tokens Plant: 15 % of tokens Additional bonuses: 3 % of tokens |
Zavod Coin Roadmap
First stage ~ 3 191 400$
1. Purchase of equipment set for manufacture of bottoms;
2. Designing and production of outfit, preparation of production facilities;
3. Purchase of required additional equipment;
4. Installation of equipment;
5. Starting-up and adjustment, commissioning.
Second stage ~ 5 413 000$
1. Purchase of plate-bending equipment;
2. Purchase of required additional equipment;
3. Preparation and reconstruction of production facilities;
4. Installation of equipment; 5. Starting-up and adjustment, commissioning.
Third stage ~ 3 615 800$
1. Purchase of high-rate TESA 10-60 unit;
2. Purchase of metallizing gun for processing of welds on zinc-coated pipes;
3. Purchase of a vertical storage capacity;
4. Preparation and reconstruction of production facilities;
5. Installation of equipment; 6. Starting-up and adjustment, commissioning.
Fourth stage ~ 4 980 000$
1. Purchase of equipment set for robotized automatic welding;
2. Purchase of high-precision equipment for cutting of metal rolls on preparation site;
3. Purchase of required additional equipment;
4. Preparation of production and storage sites, installation of equipment;
5. Starting-up and adjustment, commissioning.
Duration of every stage - 1 year. Stages can be carried out simultaneously and independently from each other.